About Our 2-Day Coating Process
First Day
Preparing and building the foundation
-
Concrete Preparation: Diamond grind the surface to ensure proper adhesion.
-
Primer or Moisture Vapor Barrier (if needed): Applied to address moisture concerns and create a solid base.
-
Base Coat Application: Lay the base coat in the color of your choice.
-
Flake or Metallic Highlights: Add decorative flakes or metallic accents, depending on the floor type.


Second Day
Finishing and perfecting the floor
-
Surface Refinement:
-
Sand the top coat to remove blemishes and bubbles (for metallic floors).
-
Scrape excess flake for a smooth finish (for flake floors).
-
-
Top Coat Application: Apply a durable polyaspartic top coat to seal and protect the floor.
-
Drying Time: Allow 24 hours for walking and 72 hours for driving to ensure proper curing.